Lift Installations in Maine
Factory-grade installs from a Rotary and Challenger Lifts authorized installer — concrete, power, anchors, the whole job.
From two-post to in-ground, we install lifts to manufacturer spec — concrete verification, anchor torque, plumb and level, electrical, hydraulic and start-up testing on every job.
Get a quote for lift installations.
Tell us about your shop. We'll come back the same day.
Request a QuoteAutomotive Lift Inspections
ANSI/ALI-aligned annual lift inspections for shops, dealerships and fleets across Maine.
New & Used Lift Sales
New Rotary and Challenger lifts plus inspected, refurbished used lifts. Every quote built around your bay.
Preventative Maintenance
Scheduled PM keeps lifts running, prevents downtime, and protects your warranty.
Lift Operator Training
Hands-on operator training so every tech lifts the right way, every time.
Lift Installations — questions we get in Maine.
How long does a lift install take?
Two-post installs are 4–6 hours, four-post about a day, in-ground lifts run over a multi-day excavation/pour/set schedule. We confirm the timeline before booking.
What concrete do I need for a two-post lift?
Most 9k–12k two-post lifts require a minimum 4-inch, 3000 PSI slab. We measure and verify on site before we drop an anchor.
Do you handle the electrical and air hookups?
We coordinate with your electrician and, if you're on our compressed-air package, drop the air line as part of the install. Every install ends with cycle testing and operator walk-through.
Are your installs Rotary and Challenger authorized?
Yes — we're a factory-authorized installer for both, which protects your warranty and gets factory parts and support if anything ever needs it.
Ready to elevate
your garage?
Quotes are fast. Installs are clean. Inspections are documented. Call now or send the form — we'll be back same day.